  PDX TCORE INTERIM WASTE MANAGEMENT AREAS BP #9 - NORTH & SOUTH TRASH NODES




Bids Due:



Pre - Bid:









Location:



Posted By:



Addenda:



Document Location:




Contact:













Description:


01-15-2020 2:00 PM



A non-mandatory, but strongly encouraged, pre-bid meeting has been scheduled for 1:00 p.m. January 7, 2020 at the Portland International Airport (7000 NE Airport Way, Portland, OR) Conference Center located on the main terminal’s mezzanine level above the Oregon Market. The stairway and elevator to the mezzanine level is located across from the Clock Tower. Specific conference room TBD. Parking validation will be available. All bidders are encouraged to attend the pre-bid meeting in order to acquaint themselves with the local conditions under which the work is to be performed and to correlate personal observations with the requirements of the contract documents.

7000 NE Airport Way



Hoffman Construction


N/A?



N/A?





Architect:

ZGF / DBC Architecture

Owner:

The Port of Portland

Phone:

(503) 221-8811









Hoffman Skanska LLC, Construction Manager/General Contractor (“CM/GC”) for PDX TCORE - INTERIM WASTE MANAGEMENT AREAS (“Project”) being performed for The Port of Portland (“Owner”) requests sub-bid proposals for Bid Package #9 - North & South Trash Nodes. The following scopes of work are available to Small Business Enterprise (SBE) certified firms ONLY (as defined by The Port): Miscellaneous Metals, Painting and Chain Link Fencing and Gates. The following scopes of work are available to all qualified firms: Canopy Steel Structure, Pavement Markings / Runway & Taxiway Marking.

 

A non-mandatory, but strongly encouraged, pre-bid meeting has been scheduled for 1:00 p.m. January 7, 2020 at the Portland International Airport (7000 NE Airport Way, Portland, OR) Conference Center located on the main terminal’s mezzanine level above the Oregon Market. The stairway and elevator to the mezzanine level is located across from the Clock Tower. Specific conference room TBD. Parking validation will be available. All bidders are encouraged to attend the pre-bid meeting in order to acquaint themselves with the local conditions under which the work is to be performed and to correlate personal observations with the requirements of the contract documents.

 

Proposals must utilize the specified PROPOSAL FORM and be submitted as a single file (less than 10MB) to BIDS@hoffmancorp.com, no later than 2:00 p.m., JANUARY 15, 2020. Elaborate proposals or the inclusion of non-essential information e.g. marketing/promotional material, etc. is strongly discouraged. Proposals that are materially incomplete, are directed to other locations or received after the bid deadline will not be considered.

 

Bidders must be properly licensed with the Oregon Construction Contractors Board (“CCB”) at the time of bid. Bidders are required to file a $30,000 Public Works Bond with the CCB in accordance with ORS 279C.836 EXCEPT exemptions allowed under paragraphs (7) or (8) will not be permitted. Due to the scheduled start of the work, the $30,000 Public Works Bond must be on file with the CCB at the time of bid. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in ORS Chapter 279C.

 

Refer to proposal documents for complete proposal requirements and additional information. Proposal documents may be examined at local plan centers, viewed and/or downloaded without charge at www.hoffmancorp.com/subcontractors.

 

Owner and Contractor are committed to maximizing small business participation in the Project. This Project has a Small Business Enterprise (SBE) aspirational goal of 20%, of which 8.5% shall be minority owned businesses. Small Business Enterprises (SBE) are defined as for-profit small businesses that be been certified by either the State of Oregon’s Certification Office for Business Inclusion and Diversity (COBID) or the Washington State Office of Minority & Women’s Business Enterprises (OMWBE). Prime-tier Subcontractors that are not certified firms will have the same goal to utilize lower-tier SBE’s for 20% of construction costs, of which 8.5% shall be minority owned businesses.

Contractor is an equal opportunity employer and request bids from all qualified firms. CCB License # 186536.