BESThq Header
 

Seattle-Tacoma International Airport - Baggage Optimization Phase 2 Project

Status:

Bids Due:

Pre - Bid:






Location:


Posted By:


Addenda:


Document Location:


Contacts:

Owner

 


Architect/Engineer




Description:

Open

9/16/2019 @2pm

Aug 14 - 11 am
17801 International Blvd., Conference Center, Central Auditorium
Aug 29 - 11 am
17801 International Blvd., Conference Center, Beijing Room



17801 International Blvd.,SeaTac, WA


Port of Seattle


INFO 2


Contract Plan Center Plan No:1498




Port of Seattle CPO Construction Services Bid Desk  17900 International Blvd., Ste. 400B SeaTac , WA 98188 Phone 206-787-3110


BNP Associates, Inc.  1999 Broadway Blvd, Ste. 3390 Denver CO 80202 Phone 720-374-4930 Fax 720-374-4929



The Work includes construction of a new Checked Baggage Inspection System and Checked Baggage Resolution Area (CBRA) that expands on the centralized baggage screening area in the airport's central terminal. The Scope of Work includes, but is not limited to the following: 1. Demolish and replace existing C1, C25, C88 (Terminal only), C92 (Terminal only), and C96 Baggage Handling Systems (BHS). 2. Construct the final BHS sortation matrix in the north main terminal. 3. Provide layout, electrical supply power, communications, and integration to the BHS conveyor and controls of the Transportation Security Administration (TSA) provided explosive detection system (EDS) machines in the Basement Level. This consists of two (2) new EDS pods with two (2) machines in each pod. 4. Demolish and replace the entire C25 BHS through the underground tunnel to the Ramp level at the South Satellite. This adds additional outbound lines in the existing baggage tunnel, replaces two (2) makeup units, provide automatic tag readers (ATR) and crossovers and demolishes the existing claims in the Federal Inspection Services (FIS) area. 5. Modify and replace the existing Claim 1 feed. 6. Replace the existing South Satellite C25-IB1 transfer input conveyor subsystem in its entirety. 7. Construct the new North-End odd-size BHS (Zone 7) and relocate existing TSA Owned CT-80. 8. Demolish C22 odd-size BHS and construct a new centralized odd-size subsystem. Modify ticket level doghouse and penetration to facilitate new centralized odd-size feed conveyor. Reconfigure TSA support equipment. 9. Construction of C92 final connections. 10. Remove and decommission various existing BHS components. 11. Demolish and install BHS make-up devices. 12. Relocate the existing tenant storage area from the Central Terminal basement level to the ramp level in the C1 building. 13. Relocate, modify and add new structural, architectural and utility systems. 14. Demolish the existing maintenance conveyor shop and construct a new shop on ramp level. 15. Construct, modify and demolish various construction elements, such as wall, ceiling, flooring and finish work. 16. Complete all MEP requirements to facilitate this work per the contract documents. 17. Perform various Regulated Material abatement. 18. Modify MK 8 feed line. 19. All system testing and commissioning, labor and testing materials. 20. Expand on screen resolution (OSR) functionality to accommodate new systems. 21. Modify existing upper level controls to incorporate the new BHS.








BESThq

12745 SW Beaverdam Rd.

Beaverton, OR  97005


(503) 626-1700

Powered by Wild Apricot Membership Software